Flexible solutions for complex tasks
We manufacture high-quality piping systems and power plant components
Finished projects
Yearly capacity
Max annual workload
Manufacturing area
Our clients
Projects and industries
Nuclear Power Plant
YUMOD project
Leibstand NPP (KKL)
Finow manufactured parts to refurbish and optimize the reactor circulation system. Replacing the pumps and gate valves in the YUMOD project helps us significantly mitigate the relevant effect of erosion and thermal embrittlement on the mechanical components.
Thermal Power plant
Ptolemais V
Mitsubishi Hitachi Power System
Supplying the high-pressure + low-pressure piping system for the turbine island with P91 and 10CrMo creep-resistant steel welds.
Offshore wind park
ST³ Offshore sp. z.o.o.
Borkum Riffgrund 2
Manufacturing J-pipes and grout systems. Pipe size: 406 x 10, Material: S355 steel.
Chemical industry
Yara Montoir Nitriс acid plant
Steinmüller Engineering GmbH
Supplying wall-mounted coils, support beams, and protective coils for the waste heat boiler to the production site with a capacity of a million tons of nitric acid, nitrates, and NPK per year.
Oil & Gas
Exhaust gas cooler
Wacker Chemicals Norway AS
In addition to gas cooler components, Finow provided project management, engineering, procurement, prefabrication, erection, tie-in, and system check services.
Boiler&Pressure parts
Shiraz Nitric acid plant
Shiraz Petrochemical Company
Supplying heater bundles and wall-mounted coils for the waste heat boiler at the nitric acid plant.
Heat exchanger
Louisiana – NH³ Heat Waste Recovery
Steinmüller Engineering GmbH
Louisiana NH³ Waste Heat Recovery Steinmüller Engineering GmbH
In less than eight months, we manufactured the heat exchanger with DN 40-mm pipes and 13CrMo creep-resistant steel welds.
Gas pipelines
Thyssen Krupp Uhde GmbH
Supplying two complete modules including steel structure works, piping and valve erection, E&I installation, and water transportation. Each weighs 95 t.
Other projects
Al Wasl Plaza, Dubai World Expo 2020
Cimolai S.p.a.
The Trellis on Al Wasl Plaza is a long-span shell structure that extends across 130 m of the central plaza area and rises to a height of 67 m. Finow’s services included inductive bending, heat treatment, and pipe cutting.